Skip to content

Pier Footing Calculator

Calculate pier footing volume, bags and weight — cubic yards/feet, 40/60/80-lb bags vs ready-mix, weight and cost with density and waste. Enter dimensions, select units and add waste to get instant, supplier-ready numbers.

1. Measurements & Dimensions

2. Material Properties & Waste Allowance

3. Optional Material Cost

PIER FOOTING CALCULATOR ESTIMATE
--

Enter dimensions above to calculate

Calculation Breakdown & StepsFormula: V = π × (diameter / 2)² × height × quantity
  1. Enter values to see step-by-step substitution.

    Engineering Assumptions:

    • Use the diameter, not the radius.
    • A form diameter estimates concrete volume; it does not select an adequate footing size or embedment.
    VISUAL GUIDE — PIER FOOTING CALCULATORfoundation · pier-footing-calculator

    TOP VIEW — Diameter × Height / depth

    Pier Footing Calculator topDiameter 18inHeight / depthPier Footing18×14 = 252 in²

    SECTION — Number of identical cylinders 4in

    Pier Footing Calculator sectionPier Footing 4in4"V = π × (diameter / 2)² × height × quantity · +10% → 3.42 yd³
    Pier Footing Calculator — V = π × (diameter / 2)² × height × quantity · example 18×14 @4in = 84.0 ft³ (3.11 yd³) → 3.42 yd³ with 10% waste · pier-footing-calculator

    What Is This Calculator?

    The Pier Footing Calculator — Estimates foundation excavation, footings and walls for US homes — volume, concrete and cost.

    What Does It Calculate?

    • Footing volume in cubic yards
    • Foundation wall area and concrete
    • Excavation volume with waste

    How to Use the Calculator

    1. Measure Strip footing 40 ft x 16 in wide x 8 in deep — use feet for length/width and inches for thickness where typical.
    2. Enter values and select units. The calculator converts to feet before calculating (inches /12, yards x3).
    3. Adjust waste % and optional price, then click Calculate. Results show with waste included.
    4. Use Reset to clear and try another size.

    Formula & Engineering Methodology

    V = π × (diameter / 2)² × height × quantity

    • L — Footing length
    • W — Width
    • D — Depth

    All units convert to exact standard engineering dimensions (NIST SP 811) before calculation to ensure consistency between US Customary and Metric measurements.

    Worked Example

    Example: Strip footing 40 ft x 16 in wide x 8 in deep

    STEPVALUE
    Convert16 in=1.333 ft, 8 in=0.667 ft
    Volume40*1.333*0.667 = 35.56 ft3 = 1.32 yd3
    With waste1.45 yd3

    Construction Information

    Material: Footings 8–12 in thick, walls 8 in. Concrete 3000–4000 psi. Footing below frost line per local code.

    Footings below frost line per code. Call 811 before dig.

    Material Information

    Footings 8–12 in thick, walls 8 in. Concrete 3000–4000 psi. Footing below frost line per local code.

    Waste & Overages

    Add 10% for over-excavation and slough — trench sides cave.

    Practical Tips

    • Call 811 before digging
    • Keep footings on undisturbed soil or compacted fill

    Common Mistakes

    • Shallow footings above frost line — heave
    • Not adding extra for footing flares

    Assumptions & Engineering References

    • Use the diameter, not the radius.
    • A form diameter estimates concrete volume; it does not select an adequate footing size or embedment.

    This calculator provides an estimate based on your inputs. Actual requirements vary by site, material and installation. For code-regulated or load-bearing work, consult a qualified professional.

    Calculations run 100% in your browser — zero tracking of your dimensions or input data.

    Frequently asked questions

    What does the Pier Footing Calculator calculate?

    The Pier Footing Calculator estimates pier footing quantity for US jobs — Footing volume in cubic yards, Foundation wall area and concrete, Excavation volume with waste. Enter dimensions, choose units, add waste and price to get instant results.

    How do I measure for pier footing?

    Measure strip footing 40 ft x 16 in wide x 8 in deep on site. Use the unit selectors — the tool converts inches→feet (÷12) and yards→feet (×3) before math. For non-rectangular, split into rectangles and add.

    How much waste should I add?

    Add 10% for over-excavation and slough — trench sides cave.

    How accurate is this pier footing estimate?

    Math is exact for your inputs. Actual needs vary by site, material and installation. Add 5–10% waste for rectangular, 10–15% for irregular.

    About Calculator Street

    Built by Vipul Otari for US homeowners & contractors. Calculator inputs are processed in your browser. Estimates depend on your measurements, product specifications and the assumptions shown on this page. Confirm order quantities with your supplier and structural requirements with your project designer. Page updated: 2026-09-11.

    Free·Fast·Mobile-friendly·US units·Reviewed