Earthwork Calculator

Calculate earthwork bank volume in cubic yards and loose haulage volume — adjust for swell and waste. Enter dimensions, select units and add waste to get instant, supplier-ready numbers.

1. Measurements & Dimensions

3. Optional Material Cost

EARTHWORK CALCULATOR ESTIMATE
--

Enter dimensions above to calculate

Calculation Breakdown & StepsFormula: Bank volume = length × width × depth; loose volume = bank volume × (1 + swell / 100).
  1. Enter values to see step-by-step substitution.

    Engineering Assumptions:

    • Vertical rectangular excavation. Sloped sides, working room, overbreak and irregular ground need separate measured allowances.
    • The cost basis is bank cubic yards. Loose haulage volumes are shown separately. Swell is not a second waste allowance.
    VISUAL GUIDE — EARTHWORK CALCULATORexcavation · earthwork-calculator

    TOP VIEW — Length × Width

    Earthwork Calculator topLength 18ftWidthEarthwork18×11 = 198 ft²

    SECTION — Excavation depth 10ft

    Earthwork Calculator sectionEarthwork 10ft10"Bank volume = length × width × depth; loose volume = bank volume × (1 + swell / 100). · +10% → 6.72 yd³
    Earthwork Calculator — Bank volume = length × width × depth; loose volume = bank volume × (1 + swell / 100). · example 18×11 @10ft = 165.0 ft³ (6.11 yd³) → 6.72 yd³ with 10% waste · earthwork-calculator

    What Is This Calculator?

    The Earthwork Calculator — Volumes earthwork for US trenches and grading — cut, fill, backfill and soil weight.

    What Does It Calculate?

    • Trench volume in cubic yards
    • Backfill less pipe volume
    • Soil weight in tons with swell

    How to Use the Calculator

    1. Measure Trench 20 ft x 2 ft x 4 ft deep — use feet for length/width and inches for thickness where typical.
    2. Enter values and select units. The calculator converts to feet before calculating (inches /12, yards x3).
    3. Adjust waste % and optional price, then click Calculate. Results show with waste included.
    4. Use Reset to clear and try another size.

    Formula & Engineering Methodology

    Bank volume = length × width × depth; loose volume = bank volume × (1 + swell / 100).

    • Volume — Cubic yards with swell 1.2x
    • Depth — Feet or inches

    All units convert to exact standard engineering dimensions (NIST SP 811) before calculation to ensure consistency between US Customary and Metric measurements.

    Worked Example

    Example: Trench 20 ft x 2 ft x 4 ft deep

    STEPVALUE
    Volume ft320*2*4 =160 ft3
    Yards160/27 =5.93 yd3
    With swell 1.2x7.11 yd3

    Construction Information

    Material: Soil swells 15–25% when dug (1.2x). Clay 1.6 t/yd3, sand 1.5, topsoil 1.2. Call 811 before dig.

    Soil swells 15-25% when dug (1.2x). Clay 1.6 t/yd3, call 811.

    Material Information

    Soil swells 15–25% when dug (1.2x). Clay 1.6 t/yd3, sand 1.5, topsoil 1.2. Call 811 before dig.

    Waste & Overages

    Trench sides slough — add 10% for over-excavation. Shrinkage 10% on backfill.

    Practical Tips

    • Bench or slope sides per OSHA over 5 ft
    • Stockpile topsoil separate from subsoil

    Common Mistakes

    • Forgetting swell — truck count short
    • Not subtracting pipe volume for backfill

    Assumptions & Engineering References

    • Vertical rectangular excavation. Sloped sides, working room, overbreak and irregular ground need separate measured allowances.
    • The cost basis is bank cubic yards. Loose haulage volumes are shown separately. Swell is not a second waste allowance.

    This calculator provides an estimate based on your inputs. Actual requirements vary by site, material and installation. For code-regulated or load-bearing work, consult a qualified professional.

    Calculations run 100% in your browser — zero tracking of your dimensions or input data.

    Frequently asked questions

    What does the Earthwork Calculator calculate?

    The Earthwork Calculator estimates earthwork quantity for US jobs — Trench volume in cubic yards, Backfill less pipe volume, Soil weight in tons with swell. Enter dimensions, choose units, add waste and price to get instant results.

    How do I measure for earthwork?

    Measure trench 20 ft x 2 ft x 4 ft deep on site. Use the unit selectors — the tool converts inches→feet (÷12) and yards→feet (×3) before math. For non-rectangular, split into rectangles and add.

    How much waste should I add?

    Trench sides slough — add 10% for over-excavation. Shrinkage 10% on backfill.

    How accurate is this earthwork estimate?

    Math is exact for your inputs. Actual needs vary by site, material and installation. Add 5–10% waste for rectangular, 10–15% for irregular.

    About Calculator Street

    Built by Vipul Otari for US homeowners & contractors. Calculator inputs are processed in your browser. Estimates depend on your measurements, product specifications and the assumptions shown on this page. Confirm order quantities with your supplier and structural requirements with your project designer. Page updated: 2026-09-11.